-
Your shopping cart is empty!
Performance Ratio Test (PR TEST) of Cam Lam Solar Power Plant
28/01/2021,
Array
Performance Ratio Test (PR TEST) of Cam Lam solar power plant
Recently, EPCSOLAR engineers performed a Performance Ratio Test (PR TEST) for Cam Lam solar power plant with a capacity of 50 MW in Cam Lam district, Khanh Hoa province.
The project is invested by Central Power Corporation (EVNCPC) as an investor:
Some pictures of the project:
Refer to: WHAT IS SOLAR POWER FACTORY PERFORMANCE RATIO?
EPCSOLARVN