Performance Ratio Test (PR TEST) of Cam Lam Solar Power Plant

28/01/2021, Array

Performance Ratio Test (PR TEST) of Cam Lam solar power plant

Recently, EPCSOLAR engineers performed a Performance Ratio Test (PR TEST) for Cam Lam solar power plant with a capacity of 50 MW in Cam Lam district, Khanh Hoa province.

The project is invested by Central Power Corporation (EVNCPC) as an investor:

Some pictures of the project:

EPC solar thực hiện đánh giá hiệu suất Refer to: WHAT IS SOLAR POWER FACTORY PERFORMANCE RATIO?

 EPCSOLARVN 


News Related

There are no comment for this news.

Write a comment: